The connector trail bridge over Beaver Creek was put in place this week with the use of two large cranes at the work site on 130th Street east of Perry.
The one-mile stretch of 130th Street has been closed for nearly four weeks between L Place and M Avenue for the bridge project, which is part of the phase-four construction of the High Trestle Trail to Perry.