Admin

  • Wed September 30 2015
  • Posted Sep 30, 2015
Five Bridge surfaces are being replaced with cement this week south of Breda.

Start of the bridge project was Monday, September 28th, and is expected to be done by Friday, October 2nd. The trail in the section of the bridges will be closed for a week or longer (depending on weather).

In July, t
he Sauk Rail Trail Association (SRTA) was awarded a
$9,046.25 grant from the Warren Timmerman Trust.

This money was earmarked to pay for materials to hard surface 5 bridges in Carroll County, and rent 3 biffies for 6 months each if there is money left over from the 5 bridge project.

16,967 views

SHARE

Portals

Event

Related Sponsors

Support these BIKEIOWA Sponsors!

No comments have posted.

Leave a Comment

You must be signed in to leave a comment.